Preparation

Floor Preparation

Floor Preparation


Most floor repair or installation failures are caused by one or a combination of the following problems: inadequate surface preparation, improper material selection, improper design or construction of the concrete substrate, lack of correct construction detail treatment, or improper application of the repair materials.



At Dura Bond, we understand that professional preparation is an essential step for a successful installation of resin flooring systems, and we are prepared to provide our customers with full solutions including from product recommendation and specification through to installation and maintenance.

To ensure a successful outcome, Dura Bond offers the following floor preparation services:

  • Detailed and adequate surface profile
  • Recommendations of materials to be used on surface
  • Removal of dirt, chemicals, and other contaminants if applicable
  • Removal of existing coatings, vinyl, and tiles if applicable
  • Qualified floor preparation including hand grinding, planning or captive shot blasting to minimize dust creation.






Share by: